Our Walkout Basement
Basement forms are setup to define the
the  shape of the basement.  They require
require a special truck with a crane to lift
them into place.

 



The amount of concrete needed to fill these forms was about 45 yards, which took 5 concrete trucks to fill.




The form system, once filled, was allowed to set overnight. The next day, they came back out to remove the forms, and reveal the
basement within....



The next step is to get the basement ready for a house set. This entails putting a 2x6 sill plate on the foundation,  finishing any plumbing
that has to go beneath the 4" cap, which is poured later.




The basement, above, is now allowed to cure, ready for the final step...setting the house.